Hello! I have 10 prototype boards (same design).
The 480 × 1010 RGB LEDs on the front (XL‑1010RGBC‑WS2812B) were all placed in the wrong orientation by the assembler. I'd like them turned to the correct orientation (drawn below).
They sit on a 2.54 mm square grid, so they can be lifted and turned as whole blocks: the hole LEDs in 12×12 blocks (two 6×6 at the end), each block a quarter turn counter‑clockwise; the two power rails as 2×30 strips, each a half turn (if they turn out to be only 90° off, 2×2 blocks a quarter turn). The blocks are drawn. The LEDs can be reused; if you would rather fit new ones, I can supply them.
Nothing on the back needs touching. The boards have no jumper wires on them.
Can you do this? Roughly what price and lead time? Thank you!
LEDWhat the finished board should look like做好之后应该是这样front side · XL‑1010RGBC‑WS2812B正面 · XL‑1010RGBC‑WS2812B
The mark on the lens is on the DOUT/GND edge of the part (datasheet: ① DOUT, ② VDD, ③ GND, ④ DIN). Right now every LED has it toward the top edge. It should be:
Hole LEDs, 360 (six per breadboard row, both bands): mark toward row 1 / the J12 end.孔位灯珠 360 颗(每行 6 颗,上下两排):标记朝第 1 行 / J12 那一端。
Rail LEDs, 120 (two rows along each long edge): mark toward the bottom edge (J3 gold fingers), for the top rails as well as the bottom rails.电源轨灯珠 120 颗(两条长边各两行):标记一律朝下边(J3 金手指那边),上边的轨也朝下。
PhotoLeft, the board as delivered: the pink arrow points at one LED turned by hand to the correct orientation (green mark toward row 1), the red arrow at the others as placed (mark toward the top edge). Right: the design's placement view.左:到货的板子。粉色箭头指的那一颗是手工转到正确方向的(绿色标记朝第 1 行),红色箭头指的是出厂原样(标记朝上边)。右:设计文件里的贴装视图。Fig. 1The part and the two required orientations, seen from the front with the row numbers reading normally (1 on the left).灯珠本体和两种要求的方向。正面视图,行号正常阅读方向(1 在左边)。
LEDTurn them in blocks整块转2.54 mm square grid2.54 mm 正方格
The 360 hole LEDs are one continuous 30 × 12 grid at 2.54 mm in both directions, and each LED's four pads are a square pattern. So a square block of LEDs lifted and turned a quarter turn about its own centre lands every LED back on a set of pads, each LED now turned the way it should be. The rails are 2 × 30 strips at the same pitch: a strip turned a half turn also lands back on itself.
Fig. 2Suggested blocks: two 12×12 and two 6×6 for the hole LEDs (quarter turn counter‑clockwise, seen from the LED side), the rails as 2×30 strips (half turn). Six lifts per board instead of 480 parts.建议的分块:孔位灯珠两块 12×12、两块 6×6(从正面看逆时针转 90°),电源轨按 2×30 整条(转 180°)。每块板 6 次操作,而不是 480 颗。
Hole LEDs: any square block works (6×6, 12×12); every block turns 90° counter‑clockwise as seen from the LED side (mark goes from “up” to “toward row 1”).孔位灯珠:任何正方形的块都行(6×6、12×12);每块都从正面看逆时针转 90°(标记从“朝上”变成“朝第 1 行”)。
Rails: check one rail LED against Fig. 1 first. If its mark points at the top edge (as in the photo), the strips turn 180°; if it points along the board, use 2×2 blocks turned 90°.电源轨:先拿一颗电源轨灯珠对照图 1。如果它的标记朝上边(照片里是这样),整条转 180°;如果标记朝板子的长边方向,就按 2×2 一块转 90°。
The LEDs are identical, so which LED ends up on which pad set does not matter; the chain is in the board.灯珠都是一样的,哪颗落在哪组焊盘上无所谓,级联顺序在板子的走线里。
Before any reheating: these LEDs are MSL 5 and have been sitting on the boards unprotected since September. Bake the boards (60 °C, 24 h) first or the lenses may pop. A fresh reel is the fallback if a block goes wrong — I can bring two.
再加热之前:这些灯珠是 MSL 5,九月以来一直裸露在板上。先把整板 60 °C 烘烤 24 小时,否则透镜可能爆裂。如果哪一块出了问题,备用方案是换新灯珠——我可以带两盘来。
What I bring我带来的
Nothing is required for the block method. As a backup I can bring two sealed reels of XL‑1010RGBC‑WS2812B (4 000 per reel, LCSC C5349953).
Every LED oriented as in Fig. 1, all 480 lit in a chain when the owner powers it (one wrong LED breaks the chain from that point on).每颗灯珠方向与图 1 一致;板主通电后整条链 480 颗全亮(有一颗方向错,从那颗往后就不亮)。
Hello! Besides the LEDs, these 10 boards need two back‑side modifications (drawings below):
① Replace one QFN chip + cut‑and‑jumper (U1)
Remove U1 (QFN‑24, 4×4 mm, 0.5 mm pitch), fit the ATtiny I supply (same package, pin 1 as drawn). Then cut 2 traces, run 3 enamel‑wire jumpers and bridge one 0201 capacitor — steps ①–⑤ on the drawing.
② Sensor supply cut‑and‑jumper (9 × SOT‑23‑6)
6 of them get one supply trace cut (positions drawn); 5 get one enamel wire each to an edge pad (longest about 6 cm); 1 needs no wire.
Both only after the LED job (after the board has been through the oven). Can you do this, and roughly what price and lead time? Thank you!
Optional. This tab is only needed if the shop is asked to do the U1 and sensor rework too. Either way it happens after the LED reflow: enamel wires, glue and the 0201 cannot go through the oven.
Order of work: LEDs first (the board goes through reflow), then U1, then the sensor wires. Enamel wires, glue and the 0201 bridge must not go through the oven.
2U1: replace the I²C switch with a microcontrollerU1:把 I²C 开关换成单片机back side · QFN‑24 4×4 mm 0.5 mm背面 · QFN‑24 4×4 mm 0.5 mm 脚距
U1 (a TCA9548A) is on a footprint whose pads are wired for the wrong pin numbering, so it never worked and comes off. Two options; the ATtiny plan (2A) is preferred. Both share the same removal step.
Any 24‑pin VQFN tinyAVR works and the procedure is identical: ATtiny807 / 1607 / 3207 / 817 / 1617 / 3217 / 1627 / 3227 (same pinout, 4×4 mm, 0.5 mm pitch; verified against the ATtiny1627 and 3217 datasheets). The part's pin 3 is GND and pin 4 is VDD, which land on two signal pads of this footprint; the rest lines up as is.
Fig. 2U1 from the back, 1 mm grid. Orange pads are the ones that get work. Numbers ①–⑤ match the steps below. The dashed diamond is the new chip's outline; ● is its pin‑1 corner (pad 1 / pad 24 corner).U1 背面视图,1 mm 网格。橙色焊盘是要动的焊盘。编号 ①–⑤ 对应下面的步骤。虚线菱形是新芯片外形,● 是它的 1 脚角(焊盘 1 / 焊盘 24 那个角)。
0Remove U1 with hot air and clean all 24 pads and the centre pad.0热风枪拆掉 U1,清理 24 个焊盘和中间大焊盘。
1Cut two traces: the ones leaving pad 3 and pad 4, about 1 mm out from the pads, where they run side by side (0.5 mm apart). Do not touch the neighbouring traces of pads 2 and 5.1割断两条走线:从 焊盘 3 和 焊盘 4 引出的那两条,在离焊盘约 1 mm、两条线并排(间距 0.5 mm)的地方割。不要伤到旁边焊盘 2 和焊盘 5 的线。
2Bridge a 100 nF 0201 capacitor across the stubs of pads 3 and 4, between the pad ends and the cuts (an 0402 standing on end also works).2跨焊一个 100 nF 0201 电容在焊盘 3 和焊盘 4 的线头上,位置在焊盘末端和割口之间(0402 立焊也可以)。
3GND wire: enamel wire from pad 3 (or the capacitor's end on that side) to pad 12, run over the top of the new chip and tacked down.3地线:漆包线从 焊盘 3(或电容那一端)飞到 焊盘 12,从新芯片顶上走,点胶固定。
43.3 V wire: enamel wire from pad 4 (or the capacitor's other end) to pad 24, across the corner of the chip.43.3 V 电源线:漆包线从 焊盘 4(或电容另一端)飞到 焊盘 24,跨过芯片的角。
5SD0 wire: the trace you cut at pad 4 continues to a via 4 mm away (yellow ●). Solder an enamel wire to that via (scrape the mask) or to the cut‑off stub, and bring it to pad 21. Nothing else is cut for this: pad 21's own trace only goes to an edge pad.5SD0 飞线:焊盘 4 被割断的那条线继续通到 4 mm 外的一个过孔(黄色 ●)。把漆包线焊在该过孔上(刮开阻焊)或焊在割断后的线头上,另一端焊到 焊盘 21。这一步不需要再割线:焊盘 21 自己的线只通到板边焊盘。
6Fit the ATtiny: pin‑1 dot at the pad 1 / pad 24 corner (● in Fig. 2 — the footprint's original pin‑1 mark). Solder all 24 pins; the centre pad may be left unsoldered (it has no copper under it and is not electrically connected inside the chip).6贴上 ATtiny:1 脚圆点对准焊盘 1 / 焊盘 24 那个角(图 2 的 ●,也就是封装原来的 1 脚标记)。24 个脚都焊好;中间大焊盘可以不焊(板上这里没有铜,芯片内部也没有电连接)。
Check with a meter (power off): pad 3 ↔ pad 12 short; pad 4 ↔ pad 24 short; pad 3 ↔ pad 4 open; pad 4 ↔ the SD0 via open; pad 21 ↔ the SD0 via short; no short between pads 2–3, 4–5.
2B · Any other MCU: a module on 20 wires (fallback)其他单片机:小模块飞 20 根线(备选)
If no 24‑pin tinyAVR turns up, any small MCU board (a 20‑pin ATtiny1616/1614 on a breakout, a CH32V003 board, an RP2040‑Zero, …) can hang off the same footprint. No cuts. After removing U1, glue the module nearby (the empty centre pad is a good spot for a tiny one) and run enamel wires from its pins to the U1 pads below. Which MCU pin goes to which wire is up to the firmware; the shop only needs the pad list.
leave empty (pad 23 is the host I²C SDA, pad 22 the host SCL — a module could listen there, but nothing is required)空着(焊盘 23 是主机 I²C 的 SDA,焊盘 22 是 SCL——模块可以接来监听,但不是必需)
20 wires per board: 16 sensor lines + 3.3 V + GND + RX + TX. If the module has its own regulator it still runs from the 3.3 V pad (feed its 3V3 pin, not VIN).
每块板 20 根线:16 根传感器线 + 3.3 V + GND + RX + TX。模块即使自带稳压器也从 3.3 V 焊盘供电(接模块的 3V3 脚,不要接 VIN)。
3Sensor supplies: six cuts, five wires传感器供电:割 6 处,飞 5 根线back side · 9 × TMAG5273 SOT‑23‑6背面 · 9 颗 TMAG5273 SOT‑23‑6
The nine magnetic sensors on the back are powered in three columns; the design needs each one powered on its own. Six sensors get their supply trace cut just after their own 100 nF capacitor, so each keeps its capacitor and becomes an island. Five of those islands get a wire to a free edge pad; the sixth (M55) already has an edge pad of its own (J12 pin 30) once it is cut free. The top row (M52, M54, M56) is untouched.
Fig. 4The whole back of the board, turned over about its long axis (J13 now on the left, J12 on the right, top edge still up — the same way the silkscreen row numbers read on the back). Red = cut, ● = solder the wire here, coloured lines = the five wires and their destination pads.整块板的背面,沿长边翻过来看(J13 在左、J12 在右,上边仍在上——和背面丝印行号的阅读方向一致)。红色 = 割口,● = 飞线焊点,彩色线 = 5 根飞线及其目标焊盘。
Sensor传感器
Where位置
Cut割口
Wire from飞线起点
Wire to飞线终点
Length线长
M58
middle row, J12 end (by row 1)中排,J12 端(第 1 行旁)
between C18 and the viaC18 和过孔之间
C18 pad焊盘 ●
J12 · 23
~15 mm
M51
middle row, centre (row 15/16)中排,中间(第 15/16 行)
between C19 and the viaC19 和过孔之间
C19 ●
J13 · 25
~55 mm
M53
middle row, J13 end (row 30)中排,J13 端(第 30 行)
between C20 and the viaC20 和过孔之间
C20 ●
J13 · 23
~15 mm
M55
bottom row, J12 end下排,J12 端
between C21 and the via (the branch to the edge pad stays)C21 和过孔之间(通到板边焊盘的那一支保留)
—
J12 · 30 (already)(已连)
0
M57
bottom row, centre下排,中间
between C22 and the viaC22 和过孔之间
C22 ●
J13 · 26
~50 mm
M59
bottom row, J13 end下排,J13 端
between the VCC pin and the via (C23 hangs off the pin and stays)VCC 脚和过孔之间(C23 挂在脚上,保留)
C23 ●
J13 · 24
~12 mm
Close‑ups of each cut (back view, same scale within each panel). The wire may start on the capacitor pad, on the sensor's VCC pin, or on the trace stub between them — whichever the technician prefers; the point is that the sensor and its capacitor stay together on the wire side of the cut.
Find the sensor by the silkscreen row numbers on the back (Fig. 4): the middle row sits between the two LED bands, the bottom row just inside the bottom rail LEDs.按背面丝印行号找到传感器(图 4):中排在两排灯珠之间,下排紧挨着下边电源轨灯珠的内侧。
Cut where the red bar is: a short trace on the back copper between the sensor's capacitor and a via. Confirm with a meter that the sensor's VCC pin no longer reads short to J13 pin 4 / 5 / 6.在红色标记处割线:背面铜皮上、传感器电容和过孔之间的一小段走线。用万用表确认传感器的 VCC 脚和 J13 第 4 / 5 / 6 脚不再导通。
Solder the wire at ●, route it flat along the board (avoid crossing the two I²C traces more than necessary), tack it down, and land it on the edge pad listed. The edge pads are the gold fingers of J12/J13 (back side copper); solder on the back.在 ● 处焊上飞线,贴着板子走线(尽量少跨过两条 I²C 走线),点胶固定,另一端焊到表中的板边焊盘。板边焊盘是 J12/J13 的金手指(背面铜皮),焊在背面。
M55: cut only. Its VCC pin is already tied to J12 pin 30 by its own trace; after the cut that pad is its private supply.M55:只割线。它的 VCC 脚本来就有一条自己的线通到 J12 第 30 脚;割开后这个焊盘就是它单独的供电。
Check with a meter: for each of the six, VCC pin ↔ J13 pin 4/5/6 open; VCC pin ↔ its own 100 nF pad short; VCC pin ↔ its edge pad short (M58→J12·23, M51→J13·25, M53→J13·23, M55→J12·30, M57→J13·26, M59→J13·24). The top row stays: M52↔J13·4, M54↔J13·5, M56↔J13·6 short.
U1: the meter checks in 2A (or 2B wires continuous to their pads); no bridges on the 0.5 mm pads; chip pin 1 at the ● corner.U1:做 2A 里的万用表检查(或 2B 的每根线到焊盘导通);0.5 mm 焊盘无连锡;芯片 1 脚在 ● 的那个角。
Sensors: the meter checks in job 3. Wires tacked so they cannot be caught by a finger.传感器:做第 3 项的万用表检查。飞线固定好,不会被手指勾到。
Nothing else on the back was disturbed: the 9 sensors, their capacitors, the two small WLP parts (U11/U12) and the regulator (U3) all still seated after the reflow.背面其他元件没被动过:9 颗传感器、它们的电容、两颗小 WLP 元件(U11/U12)和稳压器(U3)过炉后都还在位。
Notes for Kevin (not for the shop)给 Kevin 的备注(不用给师傅看)
Why pad 21, and the host side after the rework
SD0 → pad 21 (PC4) instead of pad 22 (PC5): pad 21 is the A2 net, which only goes to J12 pin 21 and TP5, so it needs no cut; pad 22 is the SCL_0 stub to R1 and would need one. PC5 then just sits on the host SCL as an input. Firmware: SD lines PC4/PA5/PA7/PB6/PB3/PB1/PC0/PC2, SC lines PA4/PA6/PB7/PB5/PB2/PB0/PC1/PC3 (channel 0‑7 in that order), all readable in three VPORT reads.
J12 pins 19/20/21 must no longer be grounded at the host (they were the A0–A2 ground wires). 19 = host TX → PA2 (USART0 alternate RXD, works on 0/1/2‑series), 20 = host RX ← PA3 (bit‑banged TX on every part: the hardware TXD options are PA1 — pad 24, tied to 3V3 — and PB2/PC2, which are channel lines; the 2‑series USART1 adds nothing free). 21 carries SD0 now: leave it open. 22 is floating after the pad‑3 cut: leave it open, or stop driving GP2.
UPDI = pad 23 = SDA_0. Program through TP9 (J12 end) or TP15 (J13 end) with the host's SDA pin tri‑stated and the TMAG supplies off. Bus traffic can enable the UPDI PHY now and then; a valid frame by accident is very unlikely, and the PHY times out, but if a tiny ever resets under heavy bus traffic, cut the pad‑23 stub (the SDA_0 trace leaving pad 23 toward R2) and program on the pad. Pre‑programming the chips on a QFN‑24 socket before the shop solders them avoids the question entirely.
No pull‑ups on the 16 channel lines (R1/R2 are on the host bus only). Drive SCL push‑pull and SDA open‑drain with the internal pull‑up (≈35 k); traces are short.
There is no capacitor at all on +3.3V on the board (U3's output has none), hence the 100 nF on the chip. Once the LEDs are fixed, LED_5V is live again and U3 makes 3.3 V: remove the host 3V3 feed from pin 16 or you have two regulators fighting. A 1–4.7 µF across TP11/TP12 (J13 end) would not hurt.
Exposed pad: the footprint's centre pad has no net and the tinyAVR's pad is not electrically connected (datasheet 4.1.1), so leaving it floating is fine; it only loses a thermal path the chip does not need.
TMAG edge pins: new map MVCC_3 M58→J12·23, MVCC_4 M51→J13·25, MVCC_5 M53→J13·23, MVCC_6 M55→J12·30, MVCC_7 M57→J13·26, MVCC_8 M59→J13·24; MGND_0–2 stay on J13·20–22 and still need GND at the host. Your V‑next schematic puts MVCC_3 on J13·7 and MVCC_4–8 on J13·20–24; matching that on these boards would mean freeing 20–22 (3 more cuts + 3 ground wires), which I left out. If you want it, say so and I will redraw. BoardPins.h needs the new assignments either way.
Rail LEDs: in your photo the top‑rail parts sit the same way as the hole parts (mark toward the top edge), while the design wants their mark toward the bottom edge — 180° off, not 90°. Check one before the shop starts; it decides whether the rails go as 2×30 strips (180°) or 2×2 blocks (90°).
Block flip, the mechanics: the hole LEDs are one 30×12 grid at 2.54 mm (the "gap" between the two bands is exactly one pitch), pads are a square pattern, so any square block turned about its centre lands on pads. Carrier: a flat plate (glass slide, aluminium, FR4 offcut) faced with polyimide tape, pressed onto the block; board on a hot plate ~230–240 °C or a preheater at ~160 °C plus hot air over the block; lift when every joint in the block is molten, turn, set back onto fluxed pads while they are still molten or reflow once more; peel the tape cold. Datasheet allows two reflows and they have had one — a lift‑and‑return done within one heat cycle keeps it at two. The 2 V / 3.5 A episode was ~15 mW per LED through ESD diodes; I would expect them to survive, and a dead one shows up at once because the chain stops there. Bake the boards (60 °C, 24 h) before any of this: MSL 5, unbagged since September.
Simulated check: with exactly the six cuts drawn, the copper graph splits into the intended islands — MVCC_0: {M52, J13·4} {M55, J12·30, TP17} {M58}; MVCC_1: {M54, J13·5, J12·31, TP18} {M57} {M51}; MVCC_2: {M56, J13·6, J12·32, TP19} {M53} {M59}. TP17 stays with M55 (handy probe point), TP18/TP19 with the top row.
Sourcing
ATtiny3217‑MFR is LCSC C617969; ATtiny1627/3227 (‑MU/‑MFR), 1617, 817, 807/1607/3207 are equivalent for this job — the package suffix must be the 24‑pin VQFN ("M" in Microchip's code). In HQB ask for 「ATtiny3217 QFN24」 or 「ATtiny1616 的 24 脚版」; 1616/3216 are 20‑pin and do not fit.
LEDs: XL‑1010RGBC‑WS2812B, LCSC C5349953, ≈ $0.05–0.08 each, 4 000 per reel; two reels. XINGLIGHT is a Shenzhen brand and HQB LED counters stock the 1010 WS2812 family — bring the exact part number so the pad pattern and pinout match.
Enamel wire 0.1–0.15 mm (漆包线), UV solder mask (UV 阻焊油/绿油), 100 nF 0201 — any tools counter.
这一节是给 Kevin 的英文技术备注(固件引脚、UPDI 编程、主机接线变化、器件采购),切到 EN 查看。
Finding the right person in Huaqiangbei在华强北找对人
Two different trades do this work, and they sit in different buildings. Floors and booths move, so treat the building notes as where to start walking, and the signage and bench checks as the real test.
Trade 1 — microsoldering benches (U1, the sensor wires, or hand‑turning LEDs)
Who they are. Phone‑repair technicians. The ones to look for are the counters advertising iPhone 内存扩容 / 硬盘升级 (storage upgrades): that job is a BGA NAND swap under a microscope every day, so they have a preheater, a temperature‑controlled hot‑air station, flux, enamel wire and a UV lamp — exactly the kit for 0.5 mm QFN work and 飞线. Signs to read: 主板维修 · 芯片级维修 · BGA返修 / 植锡 · 飞线 · 内存扩容.
Where. The phone‑repair floors: the ground floor and the communications‑market side of 赛格广场 (SEG Plaza, 华强北路 1002 号), 通天地通讯城, the repair floors of 远望数码城, 飞扬时代大厦 and 龙胜. All within a ten‑minute walk of each other along 华强北路 / 振兴路.
What to look for at the bench. A stereo microscope that is actually switched on; a preheater plate (预热台) under the board they are working on; an ESD mat and strap; a tray of enamel wire spools and a UV curing lamp — if those two are on the bench, they do fly‑wire repairs routinely. A bench with only a hot‑air gun and an iron, no preheater, is a bad fit for this board: it is a thick four‑layer panel with a lot of copper, and hot air alone lifts pads before it melts solder.
How to pick one. Show the Chinese card, then Fig. 2 and Fig. 4 on your phone. Ask them to point at pad 3 and pad 21 on your actual board. If they find them in a few seconds and reach for the microscope, you are in the right place; if they wave it off as easy without looking, keep walking. Then: 「先做一块样」 (one board first), check it with a meter against the lists on the bodges tab, then hand over the rest.
Trade 2 — only if you strip and replace instead
With the block method, the LED job is a repair‑bench job too: a hot plate or preheater under the board, a flat carrier with polyimide tape over a block, lift while molten, quarter turn, set back on fluxed pads. Same benches as Trade 1; ask 「有没有加热台 / 预热台」 and whether they have done 整块转移 before. Only if you decide to strip and fit new LEDs does it become a small‑batch SMT job (stencil, pick‑and‑place, oven), which is not a market stall: those are the SMT 打样 / 小批量贴片 houses in 龙华, 宝安, 龙岗, reachable via 淘宝 / 1688 / 闲鱼 (search SMT打样 深圳 来料加工 返修) or through the 钢网 (stencil) counters on the upper floors of 赛格电子市场 and 华强电子世界, who supply all of them. Turnaround there is 2–5 days.
Things to watch out for
Bake first. The LEDs are MSL 5 and have been on the boards unbagged since September; reheating them without a 60 °C / 24 h bake risks popped lenses. A shop that has never heard of baking is not the shop for this.
Carrier, not tweezers. The point of the block method is that a block moves as one rigid piece on a flat carrier. Someone proposing to nudge 480 parts one at a time with tweezers has not understood it, and will charge per part.
Orientation. Make them show you, on your board, which way the green mark goes for a hole LED and for a rail LED before they start. The two groups differ; a shop that turns everything by the same angle gets 120 of them wrong.
The back side. Say explicitly that the nine SOT‑23‑6 sensors, the small WLP parts and the QFN stay. Some shops “tidy up” anything that looks loose.
Order of work. LEDs first (the board gets hot), then any wires. If you have already bodged a board, keep it out of the batch.
Deposit and proof. Pay a deposit (定金) for the sample board only, photograph your boards before handing them over, get the booth number (档口号) and a WeChat contact, and agree on what “done” means in writing on WeChat — the acceptance lines on the LED tab are enough.
Practicalities
Hours: roughly 10:00–18:30; the phone‑repair floors run later than the component floors. Mid‑afternoon is the easiest time to get someone’s attention.
Payment: WeChat Pay or Alipay everywhere (foreign cards work in both); small jobs are quoted and paid on the spot, SMT jobs on delivery.
Language: expect Chinese only. The card, the drawings and WeChat’s built‑in translate are enough; vendors are used to it.
Prices, order of magnitude only: bodge work tens of yuan per board per job at a repair bench (budget ¥500–2 000 for both jobs on ten boards); the LED block flip is six lifts per board, so expect a per‑board price in the same range once they have done the first one; the strip‑and‑replace route is ¥100–300 for a stencil plus low hundreds per board at a small SMT shop. A quote several times these is a “go away” price; the next counter is ten metres on.
Phrases
「我有十块板要返修」 I have ten boards to rework · 「飞线改板」 cut‑and‑jumper rework · 「割线」 cut a trace · 「漆包线」 enamel wire · 「拆芯片换新的」 remove the chip and fit a new one · 「QFN 二十四脚,零点五间距」 QFN‑24, 0.5 mm pitch · 「有没有显微镜 / 预热台 / 加热台」 do you have a microscope / preheater / hot plate · 「整块拿起来转」 lift the whole block and turn it · 「先烘烤 24 小时」 bake 24 hours first · 「钢网」 stencil · 「客供料」 customer‑supplied parts · 「刷锡膏过回流」 paste and reflow · 「灯珠方向贴反了」 the LEDs are placed in the wrong orientation · 「先做一块样」 do one sample first · 「十块板一起报个价」 quote for ten boards together · 「加个微信,发图给我」 add me on WeChat and send photos.
这一节是给 Kevin 的英文说明(去哪栋楼、看什么招牌、怎么判断师傅、价格数量级、常用词),切到 EN 查看。
Drawn from Hardware/WigLEDmag/WigLEDmag.kicad_pcb (as manufactured, Sep 2026 order). Pad numbers are the footprint's; J12/J13 pin numbers are the connectors' own. Back‑side views are mirrored as the technician sees the board.图纸来自 Hardware/WigLEDmag/WigLEDmag.kicad_pcb(2026 年 9 月投产版本)。焊盘编号为封装编号;J12/J13 脚号为连接器自身编号。背面视图按师傅实际看到的方向镜像。